Walter Thomas &
Associates is a service Disabled Veteran owned business and also an 8(a)
Contractor specializing in Demolition, Asbestos Abatement, Lead Paint
Removal and follow on construction as related to some demolition projects.
Along with our Mentor, Thomas Land Clearing Co., we also have shown proven
capabilities of completing Design Build projects. The intent of Walter
Thomas & Associates is to complete demolition and environmental related
services at a high level of quality and safety. We have the background to
provide these services, however, in working with my mentor, Thomas Land
Clearing Co. our strengths will more than exceed that of most of our
competitors. We look forward to working with you and your colleagues
whenever demolition services are required.
Specific Project Experience
Mr. Thomas and his senior demolition staff members have significant Federal
contract experience within the Federal facility environment in Southern
California including the demolition of 29 Palms Marine Housing, Seal Beach
Naval Weapons Station Building 26, including the following major projects:
Demolition of Los Angeles River Bridge and Channel
Improvement, USACE, Santa Ana, CA
 |
Mr. Thomas
served as Project Manager for 2 contracts, totaling >$7,000,000 for the
demolition of an abandoned railroad bridge spanning the Los Angeles
River in Long Beach, CA. Tasks included the demolition of a boardwalk,
wood railings, timber ties, tracks, bridge piers, approached, concrete
abutments, pile caps, asphalt roadway, and footings. The 2nd contract
included site clearing, obstruction removal, diversion and control of
surface water flows, fill compaction, installation of crushed stone
bedding and geotextile materials, and the placement of a rip-rap cover. |
Various Demolition Tasks, US Department of
Veterans Affairs, WLAHCC, Los Angeles, CA
|
 |
Mr. Thomas
served as Quality Programs Manager for a $629,000 contract to complete
demolition and removal of six existing structures located at the
healthcare center, including the removal of concrete slabs and footings
to a depth of one (1) foot beneath footings, asphalt, and all related
demo debris. Asbestos and lead paint were removed from various buildings
prior to demolition. Upon completion of the demolition, TLC installed
automatically controlled landscaping irrigation complete with piping;
backflow prevention; sprinkler heads; valves; and control wiring. |
|